List of completed jobs and references:

  • “Construction of decorative lightning of the “Green railway bridge over Sava“The Green railway bridge in Zagreb, more popular as “Hendrix bridge“ is a modern atraction. Lightning has been implemented, as part of its construction, which is why the bridge acts as a visual spectacle at night.

    The contours of the lower part of the bridge are emphasized along the entire lenght of the main beam and superstructure with static, neutral white light, while dynamic color lightning is activated when the train is passing.

    The bridge was built in 1939. and is a protected monument of cultural and technical heritage.

  • Project “Installation of device for compensation of reactive energy“ of City of Zagreb
  • Project of renewal of the energy and outdoor lightning plant on the railway line Osijek – Vinkovci
  • Engineering supervision on project “Construction of railroad stand Buzin“
  • Project “Installation of photovoltaic modul system for production of electricty of solar powerplant of elementary school Rudeš“
  • Project “Construction of public lightning of the surrounding of the Church of St. Matthew“, city of Zagreb
  • Project Modernization works of public lightning of Hrvatska bratska zajednica street
  • Project “Construction of public lightning of park Ribnjak“
  • Conducting of electrical installations while cabling for Wi – Fi and Digital Signage in Zagrebačka banka branch office
  • Making of technical documentation of as-built state on object Hrvatske šume UŠP Koprivnica,
    • designing main design of the subject building Administrative building, Ivan Meštrović street 28, Koprivnica“
  • Works of adaptation of the strong and weak current of the office space of the business building, Koprivnica, Hrvatske šume
  • Project of installation of signalling-safety device in station Knin
    • Station Knin is marshalling yard on railway M604 Oštarije – Gospić – Knin – Split Predgrađe
  • Electrotechnical design of ravine sanation
    • Electrotechnical design for protection of electrical installations and for earthing of the protective construction of the ravine and its connection to the return line and above ravines:
    • railway M202 Zagreb MS – Rijeka
      • ravine 31 – entrance Mance
      • ravine 62L – Donje Draževo
      • ravine 74L – ravine of tunnel Meja
      • ravine 81D – Sveta Ana
      • ravine 56D – Lič
      • ravine 60L – Zlobin
      • ravine 63D – Tuhobić
      • ravine 72D – Meja
      • ravine 73D – entrance Meja
      • ravine 75D – Bovan
    • railway M203 Rijeka – Šapjane – NB
      • ravine 8D
      • ravine 11D
      • ravine 21D
      • ravine 27L
      • ravine 31L
      • ravine 35D
  • Design “Reconstruction of kindergarden and social cultural centre in terms of kitchen and social home“
    • With this project reconstruction of the kindergarden (kitchen and social home) is foreseen
  • The military range Gašinci is a training facility of the Croatian land army
    • Located along the village of the same name, Gašinci, 10 kilometers from Đakovo. It is under management of the Infantry Regiment Command of Training and Doctrine of Croatian land army.
    • We did works on sanation and conversion of objects 50, 51 and 52 on military poligon Gašinci
  • Construction of the new railway line for suburban traffic on section Gradec – Sveti Ivan Žabno
    • The value of construction of 12,2 km long section is 203,4 millon kunas, and the project is co-financed from EU funds with 85 percent of the funds. The goal of construction of the new railway is to “bring closer“ Bjelovar and the Bjelovar region to an hour’s drive from Zagreb.